USLA Home Remodeling logo featuring a blue roof with green vertical stripes and a small blue window, accompanied by the company name and phone number 1-800-508-0259. The design represents residential home improvement and remodeling services. This logo serves as the primary branding for the company's remodeling business.
USLA Home Remodeling logo featuring a blue roof with green vertical stripes and a small blue window, accompanied by the company name and phone number 1-800-508-0259. The design represents residential home improvement and remodeling services. This logo serves as the primary branding for the company's remodeling business.
Southern California Remodeling Insights

Title 24 Kitchen Remodel: Alteration, Addition or New Construction?

Your Title 24 kitchen remodel path depends on whether the permitted work involves alterations, added floor area or new construction. Title 24 Part 6 is California’s building energy code; its requirements depend on your project’s scope.

The permitting authority’s classification determines which energy-code path applies. We review the kitchen scope before demolition and coordinate permit work through one general-contractor process.

Title 24 kitchen remodel scope classifications

White cabinets with black pulls, a gray-veined counter and backsplash, an undermount sink, and a stainless dishwasher.

New construction, additions and alterations have different compliance paths, meaning different ways to meet the code. Changes within an existing kitchen need review of the affected work and systems.

Added floor area and a kitchen within a new dwelling raise different review questions.

  • Addition: A kitchen project that adds floor area needs review under the applicable addition provisions.
  • New construction: A kitchen within a new dwelling belongs within that dwelling’s energy-code review.

The energy-code edition for your application

White flat-panel cabinets, tiled counters, an electric range, an over-range microwave, and a stainless refrigerator.

January 1, 2026, is the application threshold for California’s 2025 Energy Code. It generally applies to relevant permit applications submitted on or after that date.

The California Energy Commission’s 2025 Energy Code guidance identifies the edition and its effective date. The official edition name remains the 2025 Energy Code, even when your permit application is submitted in 2026.

Kitchen changes that define the alteration scope

On a kitchen remodel, the cabinet and counter plan is where scope starts, because it shows which walls, lines and appliance locations will move. The review then follows the systems touched by that work.

A cabinet layout can help identify appliance locations and nearby connections. It cannot establish which electrical or energy-code upgrades apply without the rest of the project documents.

Structural, electrical, gas and plumbing changes typically need permit review and appropriate qualified professionals or licensed trades. Check local requirements with the permitting authority before demolition.

Our kitchen panel upgrade discussion addresses the electrical side of kitchen planning.

  • Cabinetry and counters: Identify retained items, replacements and layout changes.
  • Lighting: Identify existing fixtures that stay and fixtures being added or changed.
  • Appliances: Identify the planned equipment, fuel type and location.
  • Electrical work: Identify changes to circuits, connections or the panel that distributes power through the home.
  • Walls: Identify walls being changed and whether they support the structure above.
  • Connected systems: Identify affected heating, cooling, ventilation and water-heating equipment.

The permitting office for your kitchen scope

White shaker cabinets with black pulls, gray-veined counters, a stainless range and microwave, and uncovered outlets.

Tarzana projects typically go through the Los Angeles Department of Building and Safety, known as LADBS. Tarzana is within the City of Los Angeles.

For unincorporated County properties, the reviewing office is typically Los Angeles County Public Works. Altadena is an example of an unincorporated community using that County path.

Submitting an application begins the review process. The required permit must be issued before the work it covers starts.

Pre-construction review before kitchen demolition

A documented pre-construction review should settle the scope classification, affected systems, jurisdiction and permit path before demolition. We use that review to connect the proposed kitchen work with the permit process.

Timing and cost follow the scope. Plan check can take several weeks before a permit is issued, and longer when structural, electrical or gas changes are involved. The main cost factors in a Title 24 kitchen alteration are the lighting being replaced, electrical or panel work, ventilation, and appliance or fuel changes, which is why we price the kitchen after the scope review, not before.

For a kitchen within new home construction, that review belongs within the larger dwelling scope. For an existing kitchen, the documents should describe the actual alterations being proposed.

We work as a direct residential contractor and hold California contractor license #1071589. Our process brings feasibility review, permit coordination and trade coordination under one licensed general contractor.

We file permit applications before construction and review the project before demolition. We decline projects that cannot be permitted as described. To start a review, contact us with your address and a short description of the kitchen work.

Call us at 800-508-0259 to discuss your kitchen’s jurisdiction, permit path and affected systems before demolition.

Get a Free Estimate Call 800-508-0259

US LA Home Remodeling Inc · 5530 Corbin Ave, Tarzana, CA 91356 · info@uslaremodeling.com

Frequently Asked Questions

If my kitchen plans were designed in 2025 but submitted in 2026, which energy code is reviewed?

For relevant applications submitted in 2026, the 2025 Energy Code generally applies. Having drawings prepared in 2025 does not establish an earlier application date. Bring the drawing history and submission records into the scope review. Qualifying wildfire-recovery projects may have specified exceptions that need separate review.

Does replacing kitchen cabinets and countertops bring the whole house under Title 24?

Cabinet and countertop replacement does not automatically trigger whole-house energy upgrades under the 2025 Energy Code. The review needs to establish what else changes with those finishes. Moving appliances or changing lighting may add systems to the permitted scope. A finish-only description should accurately reflect the work being proposed.

Are wildfire-recovery kitchen projects reviewed under different energy-code provisions?

Qualifying 2025 wildfire-recovery projects have specified relief under official guidance. Eligibility needs review for the particular property and proposed work. A kitchen’s location in an affected community alone does not establish which provisions apply. Raise the recovery status during pre-construction review so the permitting authority can identify the applicable path.

Uzi Ezra, Founder of US LA Home Remodeling Inc

About the author

Uzi Ezra

Founder & CEO, US LA Home Remodeling Inc

Uzi founded US LA Home Remodeling Inc in 2020 and leads its remodeling and ADU projects across Southern California, from pre-construction review through final inspection.