Detached ADU Construction in Los Angeles — New Build in Your Backyard
A Detached ADU Is a Completely Separate Home Built in Your Backyard
Los Angeles Backyards Aren’t All the Same — and the Rules Aren’t Either
I’ve Seen What Happens When the Feasibility Step Gets Skipped
One Licensed Contractor Handles the Entire Build — Including the Permits
Our Standards for Every Detached ADU in Los Angeles
- Foundation type confirmed after site review — slab, raised wood floor, or post-and-pier, by soil and slope
- AB 2221 setback compliance locked in at design — confirmed before the floor plan is finalized
- Utility connection coordination included — LADWP for electrical, Bureau of Sanitation for sewer capacity
- LA DBS pre-approved ADU plans evaluated — when applicable, eliminates architectural review and shortens plan check
- Separate address assignment handled — Bureau of Engineering application filed alongside the permit for rentals
- Single contractor of record throughout — CSLB #1071589 on every permit application, no license handoffs
How We Build a Detached ADU in Los Angeles
Site Diagnostics
Implementation
Post-Service Testing
Serving Greater Los Angeles — Including These Communities
Your Backyard ADU Starts With One Call — Not a Floor Plan
Detached ADU Questions, Answered for LA Homeowners
How close to the property line can a detached ADU be in Los Angeles?
Under California’s AB 2221 setback reduction, detached ADUs up to 800 square feet can sit as close as 4 feet from the rear and side property lines on most lots. But that 4-foot rule is the floor, not a guarantee — hillside lots, parcels near drainage easements, and properties inside specific overlay zones can carry setback requirements that override the state standard. We confirm the applicable setbacks in the feasibility review before any floor plan is drawn.
What is a site feasibility review, and why does it come first?
It’s a property-level assessment of your lot’s actual conditions — setbacks, utility connection points, and any easement or overlay restrictions — done before a single design decision. It takes about a week or two and costs far less than a redesign. By the time we start drawing, we already know exactly what the lot allows, so the design gets done once.
Can I use Los Angeles’s pre-approved ADU plans?
Sometimes. Los Angeles offers a library of LA DBS pre-approved ADU building plans. When your project qualifies, using one eliminates the architectural drawing review step and shortens plan check time. We assess your project’s eligibility for a pre-approved plan upfront, as part of the feasibility review.
Do I need a separate address for my detached ADU?
If you plan to rent it, yes. A separate address assignment is obtained through the LA Bureau of Engineering — a separate application from the building permit. We file it alongside the building permit so the address is ready when construction is complete.
How long does a detached ADU take to permit and build?
Plan check for a detached new build currently runs approximately 3 to 5 months under LA DBS timelines. After the permit issues, construction sequences from the foundation up through final inspection, and LADWP electrical service typically connects 4 to 8 weeks after construction is finished. The project closes when LA DBS issues the certificate of occupancy.