Frequently Asked Questions — US LA Home Remodeling Inc
About US LA Home Remodeling Inc
How do I verify that US LA Home Remodeling Inc is a licensed contractor in California?
Search for license number 1071589 on the CSLB public database at cslb.ca.gov. That database shows the license classification, current status, bond, and workers’ compensation insurance in real time. The information is updated directly by the California Contractors State License Board — not by us.
Who is the owner of US LA Home Remodeling Inc?
Uzi Ezra is the Founder and CEO. He established the company in Los Angeles in 2020 and leads the company’s projects across Greater Los Angeles today.
Where is US LA Home Remodeling Inc located?
The company’s office and dispatch address is 5530 Corbin Ave, Tarzana, CA 91356. That puts us in the western San Fernando Valley, centrally positioned for projects across Greater Los Angeles. You can also reach us at 1-800-508-0259 or info@uslaremodeling.com.
Service Area and Project Scope
What areas does US LA Home Remodeling Inc serve?
We serve Greater Los Angeles — including neighborhoods throughout the City of Los Angeles, the San Fernando Valley, and surrounding communities within LA County. If you’re unsure whether your property falls within our service area, call 1-800-508-0259 and we’ll confirm it directly.
Does US LA Home Remodeling Inc handle both remodeling and ADU construction?
Yes. We build all six ADU types recognized under California law, and we manage the full range of residential remodeling — from single-room updates through whole-house renovations. All work is performed under CSLB License #1071589. ADU construction and remodeling follow separate permit tracks in Los Angeles: a kitchen remodel goes through a different review path than a detached ADU, and identifying which track applies before design begins saves weeks.
Can US LA Home Remodeling Inc handle the permits, or does the homeowner have to do that?
We manage the full permit process with LA DBS as the licensed contractor of record — the contractor whose name and license number appear on the permit application. As contractor of record, we take legal responsibility for the permitted work and manage all required inspections. You don’t need to file or track permit paperwork separately.
Project Process and Scheduling
What happens during the first call or consultation?
The initial consultation — the first meeting where project scope, site conditions, permit requirements, and realistic timelines are reviewed — covers your project type, the property’s specific conditions, any permit requirements, and a realistic timeline. No drawings or fees are required upfront. This is the stage where we determine what your project actually involves before anything is committed to paper.
Do I need to move out of my home during a remodeling project?
It depends on the project scope. Single-room remodels — a bathroom, kitchen, or bedroom — typically allow you to stay on-site during construction. Whole-house gut renovations often require vacating at least during demolition and rough construction. We discuss occupancy planning during the initial consultation so you know what to expect before the project begins.
What happens if unexpected conditions are discovered during demolition?
Demolition sometimes reveals conditions that weren’t visible during the initial walkthrough — water damage behind walls, outdated wiring, or structural adjustments outside the original scope. When that happens, we document the findings, explain the options clearly, and outline the impact on scope and timeline. No additional work begins without your explicit confirmation. This is standard practice on every project.
ADU-Specific Questions
What is the difference between an ADU and a JADU?
An ADU (Accessory Dwelling Unit) is a fully self-contained second dwelling unit on a residential property — a new detached structure, a garage conversion, or an addition to the main home. A JADU (Junior Accessory Dwelling Unit) is smaller, capped at 500 square feet, and must be created within the existing walls of the main home. A JADU requires the property owner to live on-site; an ADU does not carry that requirement. Both are legal in Los Angeles, but they follow different permit tracks and different occupancy rules.
How many ADUs can I build on my property in Los Angeles?
It depends on your property type. A single-family lot in Los Angeles can generally have one ADU and one JADU under current California state law. A multi-family property may be eligible for more — the number depends on the existing unit count and the applicable state statute. We review each property’s specific eligibility before any project begins. The rules have changed significantly since 2020, so current law may differ from what applied to nearby properties a few years ago.
Payment and Timeline
What does a typical payment schedule look like on a remodeling project?
California law governs contractor payment schedules directly. The California Contractor Payment Limit caps the initial down payment at 10% of the project total or $1,000 — whichever is less. After the down payment, a progress payment schedule ties each installment to a specific construction milestone, such as completion of demolition, rough-in inspection sign-off, or material delivery. Progress payments are not tied to arbitrary dates. We review the full payment schedule in the contract before any work begins.
How long does a kitchen remodel typically take in Los Angeles?
A standard kitchen remodel — cabinet replacement, countertops, electrical updates, and plumbing adjustments — typically runs 4 to 8 weeks of active construction after the permit is issued. If your kitchen involves layout changes that require permit review, plan for an additional 4 to 8 weeks of LA DBS review before construction can begin. Total project duration from first consultation to completion commonly runs 3 to 5 months for a permitted kitchen remodel in Los Angeles.