USLA Home Remodeling logo featuring a blue roof with green vertical stripes and a small blue window, accompanied by the company name and phone number 1-800-508-0259. The design represents residential home improvement and remodeling services. This logo serves as the primary branding for the company's remodeling business.
Direct answers from a licensed Los Angeles general contractor.

Frequently Asked Questions — US LA Home Remodeling Inc

These questions come up on almost every first call. We’ve organized them by topic so you can find what you need fast. If your question isn’t here, reach us directly.
CSLB #1071589Founded 2020Greater Los Angeles
Theme 1

About US LA Home Remodeling Inc

You can verify everything about this company in under two minutes.

Search for license number 1071589 on the CSLB public database at cslb.ca.gov. That database shows the license classification, current status, bond, and workers’ compensation insurance in real time. The information is updated directly by the California Contractors State License Board — not by us.

Uzi Ezra is the Founder and CEO. He established the company in Los Angeles in 2020 and leads the company’s projects across Greater Los Angeles today.

The company’s office and dispatch address is 5530 Corbin Ave, Tarzana, CA 91356. That puts us in the western San Fernando Valley, centrally positioned for projects across Greater Los Angeles. You can also reach us at 1-800-508-0259 or info@uslaremodeling.com.

Theme 2

Service Area and Project Scope

We serve Greater Los Angeles — from the San Fernando Valley to communities throughout LA County.

We serve Greater Los Angeles — including neighborhoods throughout the City of Los Angeles, the San Fernando Valley, and surrounding communities within LA County. If you’re unsure whether your property falls within our service area, call 1-800-508-0259 and we’ll confirm it directly.

Yes. We build all six ADU types recognized under California law, and we manage the full range of residential remodeling — from single-room updates through whole-house renovations. All work is performed under CSLB License #1071589. ADU construction and remodeling follow separate permit tracks in Los Angeles: a kitchen remodel goes through a different review path than a detached ADU, and identifying which track applies before design begins saves weeks.

We manage the full permit process with LA DBS as the licensed contractor of record — the contractor whose name and license number appear on the permit application. As contractor of record, we take legal responsibility for the permitted work and manage all required inspections. You don’t need to file or track permit paperwork separately.

Theme 3

Project Process and Scheduling

The first conversation is about scope — not a sales pitch.

The initial consultation — the first meeting where project scope, site conditions, permit requirements, and realistic timelines are reviewed — covers your project type, the property’s specific conditions, any permit requirements, and a realistic timeline. No drawings or fees are required upfront. This is the stage where we determine what your project actually involves before anything is committed to paper.

It depends on the project scope. Single-room remodels — a bathroom, kitchen, or bedroom — typically allow you to stay on-site during construction. Whole-house gut renovations often require vacating at least during demolition and rough construction. We discuss occupancy planning during the initial consultation so you know what to expect before the project begins.

Demolition sometimes reveals conditions that weren’t visible during the initial walkthrough — water damage behind walls, outdated wiring, or structural adjustments outside the original scope. When that happens, we document the findings, explain the options clearly, and outline the impact on scope and timeline. No additional work begins without your explicit confirmation. This is standard practice on every project.

Theme 4

ADU-Specific Questions

Los Angeles has two distinct dwelling unit categories. They follow different rules.

An ADU (Accessory Dwelling Unit) is a fully self-contained second dwelling unit on a residential property — a new detached structure, a garage conversion, or an addition to the main home. A JADU (Junior Accessory Dwelling Unit) is smaller, capped at 500 square feet, and must be created within the existing walls of the main home. A JADU requires the property owner to live on-site; an ADU does not carry that requirement. Both are legal in Los Angeles, but they follow different permit tracks and different occupancy rules.

It depends on your property type. A single-family lot in Los Angeles can generally have one ADU and one JADU under current California state law. A multi-family property may be eligible for more — the number depends on the existing unit count and the applicable state statute. We review each property’s specific eligibility before any project begins. The rules have changed significantly since 2020, so current law may differ from what applied to nearby properties a few years ago.

Theme 5

Payment and Timeline

California law sets specific rules on how contractors can collect payment. We follow them.

California law governs contractor payment schedules directly. The California Contractor Payment Limit caps the initial down payment at 10% of the project total or $1,000 — whichever is less. After the down payment, a progress payment schedule ties each installment to a specific construction milestone, such as completion of demolition, rough-in inspection sign-off, or material delivery. Progress payments are not tied to arbitrary dates. We review the full payment schedule in the contract before any work begins.

A standard kitchen remodel — cabinet replacement, countertops, electrical updates, and plumbing adjustments — typically runs 4 to 8 weeks of active construction after the permit is issued. If your kitchen involves layout changes that require permit review, plan for an additional 4 to 8 weeks of LA DBS review before construction can begin. Total project duration from first consultation to completion commonly runs 3 to 5 months for a permitted kitchen remodel in Los Angeles.

Ready to Start?

Ready to Talk About Your Project?

US LA Home Remodeling Inc is reachable by phone, email, or at our Tarzana office. CSLB License #1071589 — verifiable at cslb.ca.gov.
1-800-508-0259  ·  info@uslaremodeling.com  ·  5530 Corbin Ave, Tarzana, CA 91356